Retrofit, not replace
We upgrade and retrofit assets already in operation — extending their service life and avoiding the cost and embedded carbon of full replacement.
Installation & Retrofitting
Supply is half the job. Entry Two Resources installs and retrofits filtration and air-intake systems already in service, so operators hit their efficiency and ESG targets without replacing the asset.
Retrofit, Not Replace
Most plants in Malaysia are not being rebuilt. They are being asked to run cleaner, longer and on less fuel, with the equipment already installed — and that makes retrofitting, not replacement, the practical route to the National Energy Transition Roadmap’s efficiency targets and to operators’ own 2050 net-zero commitments.
A retrofit avoids the capital cost of a new system and the embedded carbon of manufacturing and shipping one. It also avoids the outage a full replacement demands. The constraint is that a retrofit is a site engineering job: existing housings, frames and duct geometry rarely match a new element off the shelf.
That is the work we do — surveying what is installed, specifying the upgrade, fabricating the frames and adaptors it needs, and installing it offshore or on-site during the outage window.
We upgrade and retrofit assets already in operation — extending their service life and avoiding the cost and embedded carbon of full replacement.
Advanced gas-turbine intake and process filters lower pressure drop and fouling, so turbines and systems draw less energy for the same output.
Our solutions help customers progress the efficiency and emissions goals set out in the NETR and their own 2050 net-zero commitments.
Sustainability & Energy Transition
Malaysia’s energy sector is decarbonising. The National Energy Transition Roadmap (NETR) sets a path to net-zero emissions by 2050 with energy efficiency as one of its core pillars, and operators such as PETRONAS and TNB are actively cutting emissions, flaring and energy use across their existing facilities.
For most plants, that shift means retrofitting the equipment already in service to run cleaner and more efficiently — rather than replacing it wholesale. That is exactly where our filtration supply, installation and retrofitting work fits.
What We Do
From surveying what is installed today through to fitting the upgrade during the outage window — offshore or on site.
01
We measure what is actually installed — housing type, frame dimensions, duct geometry, current element and its duty — and specify the upgrade against it, rather than against a catalogue assumption.
02
Raising the efficiency grade of an existing intake or ventilation system, including the frame modifications the higher grade needs. Our Petronas Methanol Labuan programme upgraded 3V-600 F8 and E10 HEPA filtration over four years.
03
Where an upgraded element does not fit the installed housing, we fabricate and install the frames, adaptors and sealing arrangements that make it fit — the usual reason a retrofit stalls.
04
Installation and rectification work on platforms, carried out by our own crews under the operator’s permit-to-work regime — including PLC, control-system and instrumentation rectification alongside filtration work.
05
Vacuum dehydrator and lube oil purifier units supplied, rented and operated as a service — removing free and dissolved water and varnish from turbine and hydraulic oils without taking the asset apart.
06
Diverter double sealing and Inconel spring blades, air intake damper assemblies and bearings, and PE lining at coal transfer stations — the mechanical work that sits alongside filtration on an intake or exhaust system.
Project Record
Supply, installation, retrofitting and field service carried out for Petronas, TNB, EDRA CGN, Malakoff and their contractors.
Tell us what is installed today and what it needs to achieve. We will survey it, specify the retrofit and quote the installation.Or call +603 8603 1318.